The system technique, the routing of the track, the usedguideway constructions as well as their production plants aredescribed in this report. Parts of the planning activities will beexplained which are required on the German side to cover theinterface between German delivery parts and Chinese planningand production activities. Information about the absolutelyshort realization time for the erection of the guideway constructionswill be given.
Grossert, E.: TRANSRAPID Shanghai- demonstration
line - German high technology with Chinese boundary
conditions, 17'h Int. Conference on magnetically levitated
systems and linear drivers, Lausanne, Schweiz
Grossert, E.: The Maglev system TRANSRAPID - an
engineer construction of high quality, 16'h Int. Conference
on magnetically levitated systems and linear drivers,
Rio de Janeiro, Brazil2000
Fecbner, H., Grossert, E.: Die Magnetschne/lbahn- ein
Ingenieurbauwerk von hohem Rang,
Edition ETR - Eisenbahntechnische Rundschau 2001
Grossert, E.: Development and deployment of guideways
for the TRANSRAPID,
TRB Transportation Research Board, Washington,
USA Jan. 2000
Grossert, E.: TRANSRAPID Berlin - Hamburg, Fahrweg
und Fertigungsstiitten, Bautechnik (1999) H. 2
Guest Editor: Eleonora Papadimitriou, PhD
Editors: Dario Babić, PhD; Marko Matulin, PhD; Marko Ševrović, PhD.
Accelerating Discoveries in Traffic Science |
2024 © Promet - Traffic&Transportation journal