Traffic&Transportation Journal
Sign In / Sign Up
SUBMIT
FOLLOW THE JOURNAL

Article

Shanghai - Construction of the First Commercial Operational Line
Eberhard Grossert
Keywords:

Abstract

The system technique, the routing of the track, the usedguideway constructions as well as their production plants aredescribed in this report. Parts of the planning activities will beexplained which are required on the German side to cover theinterface between German delivery parts and Chinese planningand production activities. Information about the absolutelyshort realization time for the erection of the guideway constructionswill be given.

References

Grossert, E.: TRANSRAPID Shanghai- demonstration

line - German high technology with Chinese boundary

conditions, 17'h Int. Conference on magnetically levitated

systems and linear drivers, Lausanne, Schweiz

Grossert, E.: The Maglev system TRANSRAPID - an

engineer construction of high quality, 16'h Int. Conference

on magnetically levitated systems and linear drivers,

Rio de Janeiro, Brazil2000

Fecbner, H., Grossert, E.: Die Magnetschne/lbahn- ein

Ingenieurbauwerk von hohem Rang,

Edition ETR - Eisenbahntechnische Rundschau 2001

Grossert, E.: Development and deployment of guideways

for the TRANSRAPID,

TRB Transportation Research Board, Washington,

USA Jan. 2000

Grossert, E.: TRANSRAPID Berlin - Hamburg, Fahrweg

und Fertigungsstiitten, Bautechnik (1999) H. 2

Published
-
Copyright (c) 2023 Eberhard Grossert

Published by
University of Zagreb, Faculty of Transport and Traffic Sciences
Online ISSN
1848-4069
Print ISSN
0353-5320
SCImago Journal & Country Rank
Publons logo
© Traffic&Transportation Journal